The purpose of this document is to share my interview experience with a Dubai-based company for the position of Mechanical Design Engineer, requiring 5+ years of experience.

What MEP services can you design for a typical high-rise building?

I can design the following MEP services:

  • HVAC
  • Plumbing
  • Drainage
  • Smoke Management
  • Firefighting

How do you design HVAC for a G+9 residential building?

I follow the CAP approach: Client + Authority + Project.

CAP – Analysis Structure

  • Client: I will review the client's background and understand their requirements.
  • Authority: I will understand the applicable local authority regulations, codes, and limitations, if any.
  • Project: I will analyse the project details, building requirements, and intended applications.

Note: One can expect several follow-up questions on this topic.

What other equipment is used in HVAC?

Other HVAC equipment includes:

  • Ecology Units
  • Electrostatic Precipitators (ESPs)
  • Fresh Air Handling Units (FAHUs)
  • Energy Recovery Ventilators (ERVs)
  • And many more

What is an ERV?

An Energy Recovery Ventilator (ERV) provides fresh air to indoor spaces while extracting stale air from areas such as kitchens and bathrooms, depending on the system design.

Energy recovery systems help reduce ventilation energy requirements and can help maintain comfortable indoor relative humidity levels.

What are the different types of FAHU?

FAHU types vary depending on the components used for energy recovery and heat transfer. These include:

  • Single-wheel energy recovery systems
  • Double-wheel energy recovery systems
  • Heat pipe systems

What is the depth of the first manhole?

The depth of the first manhole is 45 cm, as stated in the source with reference to Dubai Municipality (DM) regulations. This value should be verified against the applicable project requirements and current authority standards.

What is the maximum depth of the FIC?

The maximum depth of the FIC depends on several factors, including:

  • Manhole distribution within the project
  • Pipe size
  • Distance between manholes
  • Depth and coordinates of the external municipality manhole

What slope do you maintain for a 150 mm pipe?

As per the Dubai Municipality (DM) values stated in the source:

Pipe DiameterPipe Slope100 mm1:60150 mm1:90200 mm1:120

Note: Verify these values against the current applicable Dubai Municipality requirements and project specifications.

How do you calculate the size of a sump pit?

The sump pit size is calculated based on the fixtures and drainage sources connected to it, including:

  • Kitchen fixtures
  • Bathrooms
  • Washrooms
  • Catch basins

The final sizing also depends on the expected inflow, required storage capacity, pump capacity, and operating cycle.

How do you calculate the head of a domestic transfer pump?

The pump head is calculated using the following formula:

H = Static Head + Friction Losses in Pipes and Fittings + Tank Discharge Pressure

As stated in the source, the tank discharge pressure is taken as 0.5 bar.

How do you calculate the head of a booster pump?

Booster Pump Head (H) = Required Discharge Pressure Head + Friction Losses in Pipes and Fittings

The calculation should also account for elevation differences and the required residual pressure at the most critical outlet.

What standards do you follow to determine loading units?

I refer to the International Plumbing Code (IPC) to determine plumbing fixture loading units, as applicable to the project and local authority requirements.

How much ACH do you consider for a corridor mechanical ventilation system?

A minimum of 6 Air Changes per Hour (ACH) is stated in the source, with reference to Dubai Civil Defence (DCD) regulations.

Which mechanical system do you design for corridor smoke management?

The system described in the source consists of:

  • Extract system: Designed to achieve 6 ACH.
  • Make-up air system: Designed to provide an airflow rate of 90% of the extract airflow rate.

Note: Confirm the required make-up air ratio and system arrangement against the applicable fire and life-safety regulations for the project.

How do you calculate the head of a firefighting pump?

The firefighting pump head is calculated using the following formula:

Pump Head (H) = Total Static Head + Friction Losses in Pipes and Fittings + Required Residual Pressure at the Remote Landing Valve

As stated in the source, the required pressure at the remote landing valve is 6.9 bar.

What is the sprinkler coverage area for a light-hazard occupancy?

The sprinkler coverage area stated in the source is 20.9 m² for the light-hazard category, with reference to Dubai Civil Defence (DCD) regulations.

The actual coverage must be verified against the applicable sprinkler design standard, sprinkler listing, spacing limitations, and project requirements.

What should be the pressure at the remote landing valve?

The pressure stated in the source is 6.9 bar, with reference to Dubai Civil Defence (DCD) regulations.

The required pressure should be confirmed against the applicable fire code and project design criteria.

What points do you consider when designing a BMS system?

The key points considered when designing a Building Management System (BMS) include:

  • Sequence of Operation (SOO)
  • Set points
  • Upper and lower operating limits
  • Maintenance requirements
  • Critical alarms

These parameters help ensure effective monitoring, control, and operation of building services systems.